







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Kitchen Remodeling: The West Palm Beach Owner’s Guide
If you have IKO products in your kitchen and something has failed, a full kitchen remodel in West Palm Beach typically runs $14,000 to $45,000 installed, depending on scope, cabinet grade, countertop material, and how much of the existing layout changes. Most complete remodels here take 4 to 8 weeks, and we walk every homeowner through the written price before the first tool comes out. The usual discovery path is a cabinet hinge that’s stripped, a countertop seam that’s opened, or a sink base that’s swollen from years of South Florida humidity, and once you start looking, the whole room tells you it’s time.

Here’s the straight version: IKO makes roofing and waterproofing products, not kitchen cabinetry or countertops. When West Palm Beach homeowners mention “IKO kitchen remodeling,” what they usually mean is a kitchen remodel on a home where IKO shingles, underlayment, or waterproofing already exists, or a project where IKO products will protect the structure around the remodel. That matters because the kitchen work and the roofing work have to talk to each other, especially in a hurricane zone. We coordinate both so the remodel doesn’t compromise the envelope, and the envelope doesn’t leak into the remodel.
Bradford Remodeling Co West Palm Beach is an independent contractor, not affiliated with IKO. We’re part of the Garrison Partners family, established in 2004, and every job runs by The Garrison Standard. That means a written price before work starts, a signed 365-Day Done Right Promise at close, and a clean site when we leave. Curtis Lane grew up in Los Angeles and learned the trade at Los Angeles Trade-Technical College before spending nearly three decades on everything from slab foundations to full gut renovations. He’s been running jobs in West Palm Beach for years, including work along the Northwood Village corridor, and he knows local inspection timelines and hurricane-strapping requirements the way most people know their own kitchen layout.
Which IKO Models This Applies To

IKO’s product lines that interact with a West Palm Beach kitchen remodel break into two groups: roof protection and wall protection. On the roof side, that’s IKO Cambridge and Dynasty shingles, Armourbase underlayment, and IKO’s self-adhered ice and water shield, which matters here because a kitchen addition or soffit change means the roof tie-in has to be reflashed correctly. On the wall side, IKO produces Enerfoil and AquaBarrier products used as weather barriers behind exterior cladding, and if your kitchen sits on an exterior wall, that barrier is part of the remodel conversation.
Here’s the compatibility gotcha most owners miss: IKO’s warranty language requires its underlayment and shingles to be installed as a system, and mixing brands at the transition where a new kitchen bump-out meets the existing roof can void the roofing warranty. We specify IKO-compatible transitions because we don’t want your kitchen remodel to quietly kill your roof coverage. The OEM versus aftermarket decision works differently for IKO than it does for a dishwasher pump. With IKO products, there is no aftermarket equivalent worth using. The system is the part. You either install the full IKO assembly correctly at the transition, or you create a leak path that shows up at the first hard rain in July. When we also work with KraftMaid, Cambria, and Silestone inside the kitchen, those brands do have legitimate aftermarket accessories like hinge replacements and edge profiles, and we’ll tell you when a generic part is fine and when it isn’t.
Styles & brands we work with







Signs Your IKO Kitchen Remodeling Is Failing
- Water staining at the ceiling corner where the kitchen meets an exterior wall. This is the classic sign that the roof-to-wall flashing above a kitchen soffit or bump-out was never tied into the IKO underlayment correctly. Florida’s afternoon thunderstorms find that gap in minutes.
- Swollen cabinet bases near the sink or dishwasher. South Florida’s humidity plus a slow drain leak saturates the substrate under vinyl or tile flooring, and by the time the cabinet base swells, the subfloor has been wet for months.
- Countertop seams that open and close with the seasons. In West Palm Beach, the temperature swings between the air-conditioned interior and the exterior wall can be 30 degrees. A seam that opens and closes means the substrate beneath the countertop was never properly stabilized.
- Soft drywall below windows or at the kitchen’s exterior corners. If the IKO weather barrier behind the siding was lapped wrong during a previous remodel, wind-driven rain gets behind it and rots the sheathing from the inside out.
- Cabinet doors that no longer square up no matter how much you adjust the hinges. This is usually framed cabinetry that’s absorbed enough moisture to warp, and once the frame is twisted, new hinges won’t fix it. The cabinet box has to be replaced or the room gets reframed.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

A full kitchen remodel in West Palm Beach runs $14,000 to $45,000 with Bradford Remodeling. A small kitchen with basic cabinets and laminate counters can land near $9,000 to $20,000. Where your number falls depends on cabinet grade, countertop material, whether walls move, and how much waterproofing work the exterior needs when we open things up. Here’s the line-item picture:
- Kitchen remodel (full scope): $14,000 – $45,000
- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Backsplash installation: $800 – $2,500
- Kitchen island installation: $3,000 – $10,000
Every price is written before work begins. No numbers move at the door. The 365-Day Done Right Promise is a written guarantee on every completed project: if the work fails inside that window, we come back and correct it at no charge. Straight number, full scope, no surprises after the invoice.
DIY or Call Us?
You can check the easy things yourself: look for water stains at ceiling corners, run your hand along countertop seams for movement, and check under the sink with a flashlight for swollen substrate. What you shouldn’t do is open an exterior wall in a West Palm Beach home to inspect the IKO weather barrier. Exterior walls carry structural load, house the electrical rough-in for the kitchen, and in a hurricane zone, the strapping and tie-downs inside those walls are part of your wind mitigation. Cutting into that without knowing where the straps run is a good way to compromise the structure and fail an inspection. If the problem is inside the wall, above the ceiling, or anywhere in the roof-to-wall transition, call us at (728) 203-9809. We’ll put eyes on it and give you a written price before anything gets opened.
FAQs

A properly executed kitchen remodel with a correctly tied IKO roof-to-wall transition should last 20 to 30 years for the structural and waterproofing elements, with cabinets and countertops in the 15 to 25 year range depending on material and how much moisture the room sees. The Florida-specific killer is always water intrusion at transitions, not the products themselves. Call (728) 203-9809 if you want an exact assessment of your current kitchen’s condition, and we’ll give you an honest timeline.
Yes, in about a third of the cases we see in West Palm Beach, the issue is isolated: one failed cabinet base, one seam, one section of exterior barrier. If the substrate is sound and the waterproofing is intact, a targeted repair is the right call, and we’ll tell you that plainly. We don’t push a full remodel when a repair does the job. Call (728) 203-9809 and we’ll tell you which one you’re looking at during the estimate.
Most full kitchen remodels in West Palm Beach take 4 to 8 weeks from first day of demolition to final walkthrough, assuming no hidden structural or waterproofing surprises once walls open. If the exterior IKO transition work is extensive, add a few days for weather and inspection scheduling. We give you a written timeline with your written price, and Curtis Lane calls you before anything changes in the field.
We don’t warehouse IKO shingles and underlayment on a shelf, but we order exact quantities through our supply channels for every project and stage deliveries to the job site in West Palm Beach. What we do carry on the truck: common cabinet hardware, seam materials for Cambria and Silestone counters, and the basic waterproofing supplies for first-day fixes. If your remodel needs IKO products, they’re ordered to spec and on site before the crew needs them. Call (728) 203-9809 for a free estimate and a materials list.
Written by Curtis Lane, Owner, Bradford Remodeling Co – West Palm Beach at Bradford Remodeling Co West Palm Beach, serving West Palm Beach and nearby areas.


